Pool lights are hooked up and will be locked into place once the plaster work inside the pool is complete.
This Saturday the inner concrete will be poured. The metal grating is to strengthen the concrete and to provide grounding area in case of lightning strike.
A shot of the mechanical pad. A wall will be built around this pad on three sides. It will be hidden behind the waterfall berm.
No comments:
Post a Comment