Tomorrow will bring the first of three concrete pours. The forms you see will create the automatic cover system. On the right is the box the cover will live in when the pool is open. The tracks down each long side will allow the cover to ride on rails to cover the pool. The second pour will cover the rail system with an apron so you can stand over the rail system. The third portion will create the patio all around the pool.
No comments:
Post a Comment