Showing posts with label Lanai Rebuild. Show all posts
Showing posts with label Lanai Rebuild. Show all posts
Monday, June 27, 2011
Monday, June 20, 2011
The Projects Are Progressing
Monday, June 13, 2011
Progress on the Deck Project
Wednesday, June 01, 2011
Monday, May 30, 2011
Wednesday, May 25, 2011
In Between The Rain Storms...
| Painted a sealant onto the sub-floor. |
| What's that you ask? The framework for 3 giant windows! The plan here is to block the wind that is always cutting across the deck. We'll still have a great view without all of the wind. |
| This sheeting is the beginning of a new tile flooring system. The plan here is to make sure we NEVER have to do this again. |
Saturday, May 14, 2011
Thursday, May 05, 2011
Growing In Our Deck!
Note the quarter in the lower right-hand corner so you can really appreciate the size of this fungus!
Wednesday, May 04, 2011
Tuesday, May 03, 2011
Monday, May 02, 2011
Sunday, May 01, 2011
Starting Tomorrow...
The covered deck is being completely replaced!
Because our builder (now bankrupt) decided to cut corners 5 years ago and create an outdoor deck with NO water protection to speak of, we are now faced with a massive reconstruction project. I started to notice the problems about this time last year. The deck tile was becoming uneven, the floor felt springy, the hand rails seemed loose and cracks had formed in the stucco below the deck. I thought the builder had just done a half-ass job but what was happening turned out to be much worse. One year later it has become obvious what was happening. The deck was sucking up water and rotting!
So what happened you ask? The builder used a paint to seal the deck. Over the years the water has gone through the tile joints and rotted the wood.
This project requires tearing out ALL of the tile, sub-floor and sides. We then have to inspect and dry out all of the joists and what ever else might have been compromised. Next comes new sub-flooring, a rubber waterproof sheet and then new ceramic tile with epoxy grout. We are then going to reinstall the rails with a little secret I'll share with you later. The final part will be re-stuccoing the entire back of the house.
As usual I will keep you all posted.
Because our builder (now bankrupt) decided to cut corners 5 years ago and create an outdoor deck with NO water protection to speak of, we are now faced with a massive reconstruction project. I started to notice the problems about this time last year. The deck tile was becoming uneven, the floor felt springy, the hand rails seemed loose and cracks had formed in the stucco below the deck. I thought the builder had just done a half-ass job but what was happening turned out to be much worse. One year later it has become obvious what was happening. The deck was sucking up water and rotting!
![]() |
| This is how the deck looked when it was new. |
![]() |
| And this is how it looks now! |
![]() |
| This tile was pulled up with a screw driver and the wood scooped out BY HAND! Total mush! The sub-floor is soaking wet! |
![]() |
| This water has soaked into everything below the deck and separated all of the wood components. |
![]() |
| The water has then come through THE BACK of the stucco and leaked through, staining everything. |
![]() |
| The water has run down the inside of all the columns and stained the concrete also. |
As usual I will keep you all posted.
Subscribe to:
Posts (Atom)












