Monday, April 28, 2008

And The Dirt Keeps Coming!



The berm building is now in full swing. Truck load, after truck load of dirt are being formed into the 5-6 foot high hills that will eventually surround the pool. The drainage systems for the whole landscaping project are currently going into the ground This is to be followed by small walls around most of the apron to keep the plant material on one side and clean concrete on the other.

No comments: