Friday, October 31, 2008

Some Repairs

You remember the Chip Master 9000 don't you? This is the 60 ton machine needed to dig the hole for the pool. Well, during one of the unloading events (the thing comes on a massive multi-wheeled trailer, takes 30 minutes to load or unload, and blocks off the whole street while it's at it.) a little misfortune befell the shop driveway.

At some point the unloading man decided that it would just be easier to roll the beast over the shop driveway rather than jockey the trailer around. This action resulted in the destruction of said driveway, and the subsequent repair you see getting started here. Step one is, remove the damaged concrete and haul away.

Step two, replace concrete.

This needs to dry, and then the expansion joints get cut in. Next spring they will come and stain the whole drive so everything matches.